Adapted P3C orion for weather reccon and studying missions.
And also the most accurate one you will find in the Workshop ;)
Features 4 Allison T-56 High torque engines capable of producing a massive 5300Libs [i] (limited to 4600SHP due to airframe limitations) [/i] and a GTCP 95-10 APU.
Startup proccedures:
PREFLIGHT
1 - APU ON / Master Reset
2 - Main Battery ON
3 - EDC 1 & 2 Connect
4 - SET Strobe light for Test
5 - Wing Tail ON
6 - HYDRAULIC PUMP 1B ON
7 - ENGINE FIRE TESTS
8 - PITCH LOCK TEST
9 - PCR OVERRIDE TEST
10 - OIL COOLER FLAPS SET TO OFF
11 - EIDS ON
12 - CDU ON
13 - TEST BRAKES
------------
ENGINE STARTUP
startup Order: 1, 2, 4, APU off, 3 or 2, APU off, 4, 3, 1
1 - Throttle lever set 0 (if not)
2 - LOW RPM SWITCHES SET ON
3 - FUEL & IGNITION SWITCHES SET ON (in case every engine is being run, if not then turn only necessary ones)
4 - APU BLEED ON
5 - BLEED AIR VALVE no# ON
6 - FUEL CUTTOFF VALVE ON
7 - CLEARANCE REQUEST
8 - START no#
AFTER STARTUP
1 - HYDRAULIC PUMP 1 set ON
2 - STROBE LIGHT SET NORMAL
3 - NAV PIL & NAV COP set ON
4 - FLAPS SET TAKEOFF and APPROACH ( 0.18 )
5 - Taxi Lights ON
6 - Landing lights ON ( If low visibility )
7 - Y trims set 0.09
8 - Parking brakes OFF