Ради вашего удобства наш сайт использует cookies! Узнать больше! Мы используем cookies

Refinery 83l

A refinery capabable of producing 83l of diesel and jet fuel per second. It takes about an hour to empty a land based oil well. Speed will decrease in the end. It needs an initial diesel delivery to fill the furnace tank. Compatible with the semi trailer and the automatic driller. Drilling is not included to reduce the costs for career saves. The automatic driller can dill to the well. If the rod is too low, just grab it with your hands and pull it up for the refinery to catch it after it is turned on. It sports a custom pipe made of hatches for increased fluid flow to the semi trailer. The custom pipe can be indiviually controlled by the control panel or radio controlled by the truck. There are three normal hose connectors under the custom pipe which allow access to the fuels as an option to the custom pipe. The hose connections can only be used manually from the operator panel on the right. This pressurises the tank for better flow. A gas relief hatch will open if the hose option is turned off. There is no pressurisation during the custom pipe use.