~3 Days of construction.
~20 M/S Surfaced ~40 M/S Dived
-4 Sonar Guided Torpedoes
Start Up:
Go to Maintenance room and flip on the breakers. Go to the Bridge and turn on the nuclear reactor. The reactor will take 2 mins to start up until it produces enough wattage to power the motors.
Diving:
Bridge Ballast Control center is on the starboard side of the bridge. Build up pressure in the air tanks until filling the ballasts. After turning the key, the rest is automatic.
Reloading Torpedoes:
After firing a torpedo, water will fill in the chamber that stows the torpedo. Water will be drained and you will have to wait until its reaches <10 liquid. Press the reload door button and go to the back of the torpedo room (Near the entrance) to press the reload button. This will move the torpedo in to the chamber. After this, close the torpedo chamber door. You are now ready to fire once again!
Things used off the workshop
-Radar
-Sonar
-Reactor
-Roll Stab
-Autopilot
-Depth Hold
-Map Screen
-Torpedoes
Thank your for taking the time to read this helpful instruction manual of the Concord Class Submarine!